Fairbanks Morse Project

Home / Portfolio / Fairbanks Morse Project
Fairbanks Morse Project

Using a 61M boom truck outside of the building to feed concrete to a 31HT boom truck positioned at the pour, the pour was completed  without the need of hundreds of feet of pipeline and with no disruption of normal business inside the rest of the building.